The Whyalla Airport Runway 05/23 Lengthen & Seal works was a significant project for the City of Whyalla. The project was initiated to increase the runway's aircraft load capacity, all weather capability, improve aviation safety, operational resilience and enhancing operational efficiency at the airport.
Civiltech Solutions played a critical role in ensuring that the Contractor completed the Whyalla Airport Runway 05/23 Lengthen & Seal works to the required specifications and aviation safety requirements mandated by the Civil Aviation Safety Authority (CASA) MoS 139. Here's how we ensured compliance and adherence to these standards.
Effective Communication: We maintained open lines of communication with the Contractor to ensure a clear understanding of the project scope, specifications, and safety requirements.
Expert Oversight: Our experienced team provided on-site supervision and oversight throughout the project, closely monitoring the activities of the Contractor to ensure compliance with the specifications and safety standards.
Quality Assurance: We implemented a robust quality assurance process to verify that all works met the required standards.
Adherence to Aviation Safety: We made sure that all works were carried out in compliance with aviation safety regulations and guidelines.
Continual Monitoring: Throughout the project, we continually monitored the progress and performance of the Contractor to identify and address any deviations from the specifications or safety requirements promptly.
By employing these measures, Civiltech Solutions ensured that the Contractor executed the works to the specifications and aviation safety requirements prescribed by CASA MoS 139.
The decision to lengthen and seal the runway was prompted by several challenges posed by the existing unsealed runway surface. These challenges include limitations in the runway length, which restricts the type and size of aircraft that can use the airport, as well as damage from weather and wear and tear that has accumulated over years of use.
The project involves lengthening the runway by 300 meters, which will provide more space for larger aircraft to take off and land. Additionally, the runway will be sealed, which will reduce the impact of weather and wear and tear, resulting in a smoother and more durable surface. The process involves utilizing innovative technologies such as GPS & UTS guided grading and compaction equipment to achieve optimal finishing results and minimize disruption to airport operations.
Whyalla Airport will benefit from improved safety, increased runway load capacity, and enhanced operational resilience. Additionally, the project's success may attract larger and more diverse aircraft, leading to economic benefits for the airport and the surrounding region. Ultimately, the Whyalla Airport Runway 05/23 Lengthen & Seal works project is a significant step towards maintaining and improving airport infrastructure to meet the needs of a growing aviation industry on the Upper Eyre Peninsular.
Location:
Whyalla, SA
Client:
City of Whyalla
Role:
Technical Engineer
Date:
September 2022 - March 2023
Suite 34, Darwin Innovation Hub,
Level 1, 48-50 Smith St Mall,
Darwin City NT 0800,
Australia
0427 142 252